Cementing that delivers wellbore integrity and zonal isolation, from primary jobs to remedial work and plug and abandonment.

Overview

What the work involves

A cement job has to do its work for the life of the well and beyond. It supports the casing, protects it from corrosive fluids and, above all, isolates zones so that oil, gas and water stay where they belong.

We provide cementing for primary, remedial and plug and abandonment (P&A) operations. Each job starts with the well: temperature, pressure, formations and fluids. We then design and test the slurry to suit, and place it with careful attention to mud removal, displacement and verification.

Good zonal isolation is also an emissions issue, because poorly cemented wells can let gas migrate to surface. The integrity discipline we apply to gas capture and conversion facilities applies here too: keep gas contained, measure it, and put it to use rather than losing it.

Key points

  • Primary, remedial and P&A cementing
  • Slurry design and testing for each well
  • Specialised systems for demanding conditions
  • Focus on long-term zonal isolation
Looking up a drilling rig derrick with stands of pipe racked inside

Capabilities

What we bring to your operation

  • Primary Cementing

    Casing and liner cementing to support the string, protect it from corrosion and isolate zones from the start of the well's life.

  • Remedial Cementing

    Squeeze cementing and cement plugs to repair poor primary jobs, seal leaks, shut off unwanted water or gas and restore isolation.

  • Plug & Abandonment

    Cement barriers designed and placed to isolate the well permanently at the end of its life, in line with the operator's abandonment programme and regulatory requirements.

  • Specialised Cementing Systems

    Cement systems matched to demanding conditions, such as lightweight slurries for weak formations, gas-tight systems where gas migration is a risk and blends for high temperatures.

  • Slurry Design & Testing

    Slurries designed for the well and tested for thickening time, compressive strength, fluid loss, rheology and free fluid before the job is pumped.

  • Job Evaluation

    Recorded job pressures, rates and densities, together with a review of cement evaluation logs, to confirm placement and isolation.

How we work

How the work is delivered

  1. Step 1: Well assessment

    We gather the well data: depths, temperatures, pressures, formations, hole condition and the isolation the job must achieve.

  2. Step 2: Slurry design and testing

    We design the slurry and spacers, then test them against the well's conditions so the job behaves as planned.

  3. Step 3: Job programme

    Volumes, pump rates, displacement and contingencies are set out in a job programme agreed with your team.

  4. Step 4: Placement

    The job is pumped to plan, with pressures, rates and densities recorded throughout.

  5. Step 5: Evaluation and reporting

    We review the job data and any evaluation logs and deliver a report confirming what was achieved.

Outcomes

What you gain

  • Reliable zonal isolation

    Correctly designed and placed cement keeps fluids in their zones and protects production for the life of the well.

  • Fewer remedial jobs

    Getting the primary job right reduces the need for costly squeeze work later in the well's life.

  • Safer abandonment

    Well-designed P&A barriers reduce the risk of long-term leaks and the liabilities that come with them.

  • Lower emissions risk

    Sound isolation reduces the chance of gas migrating to surface, which supports both safety and emissions goals.

Deliverables

What you receive

  • Cementing job programme and volume calculations
  • Slurry design and test results
  • Job execution with recorded pressures, rates and densities
  • Post-job report and evaluation summary
  • P&A barrier design and documentation, where applicable
Engineers in hard hats among the pipework of a gas processing plant

FAQs

Common questions

Not covered here? Email our team and an engineer will answer.

What is the difference between primary and remedial cementing?

Primary cementing is done when casing or liner is run, to bond it in place and isolate zones. Remedial cementing repairs problems later, for example sealing a leak, shutting off water or fixing a poor primary job, usually by squeeze cementing or setting a cement plug.

Why is slurry testing necessary?

Downhole temperature and pressure change how cement behaves. Testing thickening time, strength and fluid loss under representative conditions confirms the slurry can be placed safely and will set as required.

Do you handle plug and abandonment?

Yes. We design and place cement barriers for P&A in line with the operator's programme and the applicable regulatory requirements, and document the barriers for the well file.

Can cementing be done rigless?

Some remedial and plugging work can be done through tubing on coiled tubing, which links with our Thru-Tubing Re-Entry service. Primary cementing is normally carried out with the drilling or workover rig.