Skip to content
Codes and Cogs

Oilfield Services

Coiled Tubing

Coiled tubing interventions that start with the right diagnosis and are modelled before the unit reaches location.

Overview

What the work involves

The success of any stimulation treatment depends on identifying the well's real problem first. Acid will not fix a mechanical restriction, and a cleanout will not fix formation damage. We start with diagnosis, interpret what the well is telling us, and only then select the chemical additives and treatment technique.

We own and use a set of engineering software packages to plan each job: Cerberus for coiled tubing force and downhole hydraulic analysis, the CT Modelling Suite, Prosper for well performance analysis, FracPro for treatment design and a Real-Time Data Acquisition System for monitoring on location. Modelling tells us whether the string can reach depth, what pump rates and pressures to expect, and how the well should respond.

This is the Codes and Cogs approach in practice: software and data on one side, field equipment and crews on the other. The same modelling and real-time monitoring habits shape how we design and run gas capture and conversion systems.

Key points

  • Problem diagnosis before treatment selection
  • Force and hydraulic modelling before every job
  • Real-time data acquisition on location
  • Cleanouts, nitrogen lifting, stimulation and milling
Land drilling rig on location with a wheel loader in the foreground

Capabilities

What we bring to your operation

  • Wellbore Cleanouts

    Removal of sand, fill, scale and debris by circulation, with hydraulics modelled to keep solids moving up and out of the well.

  • Nitrogen Lifting

    Nitrogen circulated through coiled tubing to lighten the fluid column and kick off wells that cannot flow on their own.

  • Stimulation and Acidising

    Matrix acid and chemical treatments placed accurately across the target zone, with fluids and additives selected for the formation and the damage found.

  • Milling and Obstruction Removal

    Motor and mill runs to remove hard scale, cement, bridges and plugs that block access or production.

  • Force and Hydraulic Analysis

    Cerberus and the CT Modelling Suite predict string forces, reach and circulating pressures, so the job plan stays inside safe limits.

  • Well Performance and Treatment Design

    Prosper well performance analysis and FracPro treatment modelling to estimate how the well will respond and size the treatment to match.

  • Real-Time Data Acquisition

    Live monitoring of depth, weight, pump pressures and rates during the job, compared against the model as the work progresses.

How we work

How the work is delivered

  1. Step 1: Diagnose

    Review production data, well history and diagnostics to identify the real cause of the problem.

  2. Step 2: Select the treatment

    Choose the technique, fluids and chemical additives that address that cause.

  3. Step 3: Model

    Run force, hydraulic and well performance models to confirm reach, pressures and the expected well response.

  4. Step 4: Execute and monitor

    Run the job under tested pressure control equipment, with real-time data acquisition tracked against the plan.

  5. Step 5: Evaluate

    Compare the results with the model and report on well response, with recommendations for next steps.

Outcomes

What you gain

  • The right treatment, first time

    Diagnosis before design reduces the risk of pumping a treatment that cannot fix the problem.

  • Fewer surprises on location

    Modelled forces and pressures lower the risk of stuck pipe, failed runs and unplanned trips.

  • Measured results

    Real-time data and a post-job comparison against the model show what the treatment achieved.

  • Better use of spend

    Treatments sized to the well avoid over-design and wasted chemicals.

Deliverables

What you receive

  • Problem diagnosis and treatment recommendation
  • Job programme with force and hydraulic modelling
  • Treatment design and fluid selection
  • Real-time job data record
  • Post-job report comparing results with the model
Two offshore workers in orange coveralls and hard hats on a vessel deck, looking out to sea

FAQs

Common questions

Not covered here? Email our team and an engineer will answer.

Why model a coiled tubing job before it runs?

Modelling shows whether the string can reach target depth, what forces and circulating pressures to expect and where the limits are. It turns surprises on location into decisions made in the office.

Which software do you use?

We own Cerberus for coiled tubing force and downhole hydraulic analysis, the CT Modelling Suite, Prosper, FracPro and a Real-Time Data Acquisition System.

What is nitrogen lifting used for?

Wells that cannot flow on their own, for example after a workover or stimulation, can be unloaded by circulating nitrogen through coiled tubing to lighten the fluid column until the well flows naturally.

Can coiled tubing be combined with thru-tubing work?

Yes. Coiled tubing is a common way to convey thru-tubing tools for sand control, zonal isolation and cleanouts, so the two services are often planned together.

Start a project

Have a flare site, a gas supply question or a well to fix?

Tell us where the gas is and what you need. Our engineers will come back with a practical first assessment and a clear next step.